Draft Estimate for the Budget for the Financial Year of 2015/2016 in Uganda – Quotes and Outtakes

5000UGX

Draft estimate for the Financial Year of 2015/2016 and how it’s expected to be. It will be a bunch of numbers and I have picked the ones that seem special. The ones that could be questioned and ask yourself why they use so much money on? That tells about how much the government of Uganda planning to use on certain pieces of civil service and ministries that they run. Everybody that wants to look and understand a bigger picture will get a bit more information. But even if this feels like a long piece. Remember the document that was swallowed into this was close to 1200 pages. So that I have written a long piece it’s a reason why and how it became this long. Hope your get some insights and it was worth my time.

Piece by Piece, Government Organization and Ministry:

Office of the President:

The Salaries are the same from 2014/2015 to 2015/2016. No change the same 26,233,125 UGX. The rest of the expenditure is the same except for the secret payment between the financial years and that is the “Classified Expenditure” which goes up sustainably from 2014/2015 when it was 11,069,633 to the next 2015/2016 it becomes 18,069,633. So it means that the Office of the President has one expense that goes to something secret and is up 7,000,000 from last year and the only one(Draft Estimates P: 30). There has even been another classified expenditure that is set for 3,940,034 UGX and this is not for the main Office of the President, but to the specific program of “Monitoring and Evaluation” (Draft Estimates P: 35). Total for the Office of the President is 53,835,847 UGX (Draft Estimate P: 42).

Statehouse:

Another “Classified Expenditure” is set for the FY 2015/2016: 36,700,000 UGX (Draft Estimates P: 44). The Total for the Statehouse is 253, 226,426 UGX (Draft Estimate P: 43).

Office of PM:

Total budget for the Office of the Prime Minister is set to be for the FY 2015/2015: 146,581,639 UGX (Draft Estimate P: 82).

UPF:

“Construction of Pakwach, Kabale, Morulem, Napak Police stations completed; Construction of a staff accommodation block of 4 units at Alebtong completed; Armouries constructed at Ikaffe, Kabalye and Olilim PTS; 10 vehicles procured for PRDP districts; ICT machinery and equipment (communication equipment) procured; Office furniture for Buliisa, Aleptong, Bukwo and Yumbe procured)” (Draft Estimates P: 25). The estimated budget for the UPF is 4bn for the FY 2015/2016.

IGP:

Gen. Kale Kayihura Salary is from next year 103,200,000 UGX (Draft Estimates P: 24).

Uganda Police Force:

Directorate of Counter Terrorism in FY 2015/2016 is 10.254.176 UGX (Draft Estimate P: 834). Directorate of Interpol & Peace Support Operations in FY 2015/2016 is 4.265.402 UGX (Draft Estimate P: 835). Kampala Metropolitan Police in FY 2015/2016 is 19.606.632 UGX (Draft Estimate P: 837). Specialised Forces Unit in FY 2015/2016 is 129.002.902 UGX (Draft Estimate P: 838). Assistance to Uganda Police – Purchase of Motor Vehicles and Other Transport Equipment – Transport Equipment and Aircrafts in FY 2015/2016 is 36.439.322 UGX (Draft Estimate P: 838)

Grand total for the UPF in FY 2015/2016 is 435.133.848 UGX (Draft Estimate 839).

External Security Organization:

A budget issue that is weird that the ESO in the voting didn’t put any funds for staff training for FY 2015/2016 (Draft Estimate P: 917).

Grand total for FY 2015/2016 is 18.359.204 UGX (Draft Estimate P: 914).

Uganda Prisons:

Prison and Correctional Services in the FY 2015/2016 is 136.960.199 UGX (Draft Estimate 840). Murchison Bay Hospital in the FY 2015/2016 is 418.750 UGX (Draft Estimate P: 844). Grand total for the Uganda Prisons in the FY 2015/2016 is 136.960.199 UGX (Draft Estimate P: 848).

Ministry of Defense:

Total Vote for the ministry: 1,460,211,641 UGX (Draft Estimate P: 84). The ones that caught my eyes was first Welfare and Entertainment went from last Budget Year 2014/2015: 27,190,131 and this year 2015/2016: 37,614,465 UGX. Special Meals and Drinks a new post in the ministry and costs: 94,645,610 UGX. Subscriptions we’re 2,699,752 UGX in 2014/2015 and next year 2015/2016 cost 12,099,752 UGX – for those who can see that is nearly up 10,000,000 in one budget year! My favorite post in any ministry: ‘Classified Expenditure’ in 2014/2015 costed 342,252,085 and next budget year 2015/2016 all of a sudden 606,304,585. The difference between the budget years is 264,052,500 UGX. The Classified Expenditure is spilt in two pieces. First one is the UPDF Support and is set for 258,578,085 (Draft Estimate P: 86). The second one is Defense Equipment Project is 342,352,500 UGX (Draft Estimate P: 87). AMISOM operation total is 269,784,415 UGX. Classified Expenditure for AMISOM is 5,374,000 UGX (Draft Estimate P: 88). External Project Financing: Defense Equipment from Russia is estimated for FY 2015/2016: 264,052,500 UGX and to AMISOM is 298.266.10 UGX (Draft Estimate P: 81).

Ministry of Public Service:

Total budget for is set to 21,908,949 UGX (Draft Estimate P: 103).

Ministry of Foreign Affairs:

Total budget is set to 26,605,155 UGX (Draft Estimate P: 117).

East African Community:

Grand total to the EAC in FY 2015/2016 is set to 24.407.661 UGX (Draft Estimate P: 505).

Embassies and consulates:

Mission in New York:

Grand total for FY 2015/2016 is 16.144.072 UGX (Draft Estimate P: 1024).

Mission in London:

Grand total in FY 2015/2016 is 4.711.810 UGX (Draft Estimate P: 1028).

Mission in Ottowa:

Grand total in FY 2015/2016 is 4.948.238 UGX (Draft Estimate P: 1032).

Mission in New Dehli:

Grand total in FY 2015/2016 is 3.455.643 UGX (Draft Estimate P: 1036).

Mission in Cairo:

Grand total in FY 2015/2016 is 1.998.634 UGX (Draft Estimate P: 1040).

Mission in Nairobi:

Grand total in FY 2015/2016 is 4.259.503 UGX (Draft Estimate P: 1044).

Mission in Dar Es Salaam:

Grand total in FY 2015/2016 is 2.742.654 UGX (Draft Estimate P: 1048).

Mission in Abuja:

Grand total in FY 2015/2016 is 1.589.496 UGX (Draft Estimate P: 1052).

Mission in Pretoria:

Grand total in FY 2015/2016 is 2.732.934 UGX (Draft Estimate P: 1055).

Mission in Washington:

Grand total in FY 2015/2016 is 5.853.886 UGX (Draft Estimate P: 1059).

Mission in Adis Ababa:

Grand total in FY 2015/2016 is 2.346.789 UGX (Draft Estimate P: 1063).

Mission in Beijing:

Grand total in FY 2015/2016 is 3.673.069 UGX (Draft Estimate P: 1067).

Mission in Kigali:

Grand total in FY 2015/2016 is 2.112.602 UGX (Draft Estimate P: 1071).

Mission in Geneva:

Grand total in FY 2015/2016 is 5.362.895 UGX (Draft Estimate P: 1075).

Mission in Tokyo:

Grand total in FY 2015/2016 is 3.983.632 UGX (Draft Estimate P: 1079).

Mission in Tripoli:

Grand total in FY 2015/2016 is 1.899.252 UGX (Draft Estimate P: 1083).

Mission in Riyadh:

Grand total in FY 2015/2016 is 1.999.326 UGX (Draft Estimate P 1086).

Mission in Copenhagen:

Grand total in FY 2015/2016 is 3.487.953 UGX (Draft Estimate P: 1090).

Mission in Brussels:

Grand total in FY 2015/2016 is 4.834.260 UGX (Draft Estimate P: 1094).

Mission in Rome:
Grand total in FY 2015/2016 is 4.248.162 UGX (Draft Estimate P: 1098).

Mission in Kinshasa:

Grand total in FY 2015/2016 is 3.309.956 UGX (Draft Estimate P: 1102).

Mission in Khartoum:

Grand total in FY 2015/2016 is 2.264.481 UGX (Draft Estimate P: 1106).

Mission in Paris:

Grand total in FY 2015/2016 is 4.786.408 UGX (Draft Estimate P: 1110).

Mission in Berlin:

Grand total in FY 2015/2016 is 3.775.725 UGX (Draft Estimate P: 1114).

Mission in Tehran:

Grand total in FY 2015/2016 is 2.220.432 UGX (Draft Estimate P: 1118).

Mission in Moscow:

Grand total in FY 2015/2016 is 2.366.211 UGX (Draft Estimate P: 1122).

Mission in Canberra:

Grand total in FY 2015/2016 is 3.060.051 UGX (Draft Estimate P: 126).

Mission in Juba:

Grand total in FY 2015/2016 is 3.410.337 UGX (Draft Estimate P: 1130).

Mission in Abu Dhabi:

Grand total in FY 2015/2016 is 2.407.393 UGX (Draft Estimate P: 1134).

Mission in Bujumbura:

Grand total in FY 2015/2016 is 2.019.694 UGX (Draft Estimate P: 1138).

Consulate in Guangzhou:

Grand total in FY 2015/2016 is 5.135.304 UGX (Draft Estimate P: 1142).

Mission in Ankara:

Grand total in FY 2015/2016 is 2.770.166 UGX (Draft Estimate P: 1146).

Mission in Mogadishu:

Grand total in FY 2015/2016 is 2.770.881 UGX (Draft Estimate P: 1150).

Mission in Kuala Lumpur:

Grand total in FY 2015/2016 is 1.709.952 UGX (Draft Estimate P: 1154).

Mission in Mombasa:

Grand total in FY 2015/2016 is 821.446 UGX (Draft Estimate P: 1158).

Ministry of Justice and Constitutional Affairs:

First is the difference in ‘Legislation and Legal service’ between last year’s FY 2014/2015 2.934.969 UGX and this FY 2015/2016 is 6.519.956 UGX (Draft Estimate P: 118). Total to the Ministry is 57.324.370 UGX (Draft Estimate P: 133).

Ministry of Finance, Planning & Economic Development:

Macroeconomic Policy and Management was had budget for FY 2014/2015: 14.860.620 UGX and become 22.596.043 UGX in the FY 2015/2016 (Draft Estimate P: 135). Capitalisation of Institutions cost in FY 2014/2015 the amount of 65.802.344 UGX and in FY 2015/2016 becoming 266.602.344 UGX. The Belgo-Ugandan Study went from 3.167.890 UGX in FY 2014/2015 and comes to 10.237.890 UGX in FY 2015/2016. Development Budget where the Capitalisation and Belgo Uganda Study is a part of went from 86.650.930 UGX in FY 2014/2015 to 303.365.890 UGX in FY 2015/2016. Presidential Initiatives to Banana Industry was in FY 2014/2015: 2.974.000 UGX and in FY 2015/2016 is now 6.530.000 UGX (Draft Estimate P: 135). Financial Inclusion in Rural Areas (Profira) went from 1.542.229 UGX in FY 2014/2015 to 15.251.632 UGX in FY 2015/2016 (Draft Estimate P: 136). Contribution to Autonomous Institutions from 53.986.033 UGX in FY 2014/2015 to the next year FY 2015/2016 it becomes 278..719.671 UGX (Draft Estimate P: 135). This funds that goes to Contribution to Autonomous Institutions is going to certain institutions in FY 2015/2016. Here is how it’s shared: Uganda Development Bank: 10.000.000, African Development Bank: 4.000.000 UGX, PTA Banks: 4.800.000 UGX, Post Bank: 14.302.344 UGX, Islamic Development Bank 2.000.000 UGX, UN-DCF Symposium: 1.500.000 UGX and Re-Capitalization of BOU: 200.000.000 UGX (Draft Estimate P: 142). Capital Punishment was budgeted FY 2014/2015 to 2.974.000 UGX and in FY 2015/2016 is set to become 6.530.000 UGX this is because Other Structures will cost 4.000.000 UGX and didn’t spend on that last budget year (Draft Estimate P: 158). Uganda Free Zones or Total Program 18 was set to 14.009.556 UGX in FY 2014/2015 to become 17.177.409 UGX in FY 2015/2016 (Draft Estimate P: 159). African Development Fund was there 3.600.110 UGX into subscription in FY 2014/2015. And Outputs funded in FY 2015/2016 is the same 3.600.110 UGX (Draft Estimate P: 160).  That same Output was set in FY 2014/2015, but nothing set for the FY 2015/2016, still it’ s put the same amount as last year with the same amount of cost. That doesn’t make sense.

The Grand total the MoFPED in FY 2014/2015 was 281.508.520 UGX and in the new FY 2015/2016 becoming 551.167.383 UGX (Draft Estimate P: 168).

Ministry of Internal Affairs:

Support of the Government Chemist was in FY 2014/2015 was set for 1.301.805 UGX and now in FY 2015/2016 became 3.331.805 UGX. It went up because this year Machinery and Equipment for 1.058.000 UGX compared to last FY (Draft Estimate P: 176).

Ministry of Agriculture, Animal & Fisheries:

Agriculture Supplies from the FY 2014/2015 budget for 7.981.942 UGX and for the FY 2015/2016 set to be 43.285.943 UGX (Draft Estimate P: 184). Transport equipment FY 2014/2015 set 2.400.000 UGX and in next year FY 2015/2016 is set to 4.166.500 UGX. Engineering and design studies & Plans for Capital in FY 2015/2016 set for 4.841.848 UGX. Northern Uganda Farmers Livelihood Improvement Project FY 2015/2016 set for 2.121.842 UGX.  Farm-Based Bee Reserves Establishment Project started in the FY 2015/2016 to be 300.000 UGX.   The Goat Export Project in Sembule District FY 2015/2016 set for 1.200.000 UGX. Livestock Diseases Control Project Phase 2 FY 2015/2016 set to be 7.855.600 UGX (Draft Estimate P: 203-205). Sustainable Fisheries Development Project FY 2015/2016 set to be 1.341.000 UGX (Draft Estimate P: 206). Water for Agriculture Production FY 2015/2016 is 2.588.320 UGX (Draft Estimate P: 209). MAAIF Coordination/U Growth FY 2014/2015 was set 2.417.000 UGX in FY 2015/2016 set to be 27.217.803 UGX (Draft Estimate P: 214). The Project on Irrigation Scheme Development in Central and Eastern Uganda (PISD)-JI in FY 2015/2016 is set to 5.319.848 UGX. National Farmers Leadership Center (NFLC) FY 2015/2016 is set to 800.000 UGX (Draft Estimate P: 215).

Total budget for the Ministry of Agriculture was in the FY 2014/2015: 84.075.417 UGX and FY 2015/2016: 142.530.281 UGX (Draft Estimate P: 217).

National Environment Management Authority:

Grand total for FY 2015/2016 is 9.147.189 UGX (Draft Estimate P: 871).

National Agricultural Research Organization:

NARO Internal Audit budgeted for FY 2015/2016 is 82.500 UGX.  National Coffee Research Institute for FY 2015/2016 is 219.156 UGX (Draft Estimate P: 796). National Crops Research gets for FY 2015/2016 is 670.049 UGX (Draft Estimate P: 800). National Fisheries Research gets for FY 2015/2016 is 589.512 UGX. National Forestry Research gets for FY 2015/2016 is 439.458 UGX (Draft Estimate P: 801). National Livestock Research gets for FY 2015/2016 is 311.856 UGX (Draft Estimate P: 802). National Coffee Research Institute gets for FY 2015/2016 is 219.156 UGX (Draft Estimate P: 813).

Grand total for NARO for FY 2015/2016 is 98.983.410 UGX (Draft Estimate P: 817).

National Animal Genetic Resources Centre and Data Bank:

Grand total for FY 2015/2016 is 4.450.000 UGX (Draft Estimate P: 706).

Dairy Development Authority:

Grand total for FY 2015/2016 is 5.044.202 UGX (Draft Estimate P: 650).

Uganda Coffee Development Authority:

Workshops and Seminars for FY 2014/2015 is 988.640 UGX (Draft Estimate P: 920). Medical and Agricultural supplies for FY 2014/2015 is 28.352.628 UGX (Draft Estimate P: 921). Grand total for FY 2014/2015 is 43.792.300 UGX (Draft Estimate P: 919).

Uganda Cotton Development Organization:

Cotton Production Improvement for FY 2015/2016 is 3.911.000 UGX. Grand total for FY 2015/2016 is 7.786.481 UGX (Draft Estimate P: 897).

Ministry of Local Government:

District Administration and Development FY 2014/2015 the GoU is 8.857.525 UGX and External Finance 186.249.482 UGX totally for the FY 2014/2015 was 195.107.007 UGX. On the FY 2015/2016 GoU is 8.275.525 UGX and External Finance 80.987.122 UGX. Totally FY 2015/2016 is now 89.262.647 UGX. The External Finance from last budget year went down totally of 96.986.835 UGX. Which is significant And the total budget cuts is 105.844.360 UGX (Draft Estimate P: 219).  Easy see that the External Finance is the reason why the cuts have happen.

Markets and Agriculture Trade Improvement Project is FY 2014/2015 was 31.949.871 UGX. Had External Finance 29.879.482 UGX and GoU 2.070.389 UGX. The next FY 2015/2016 put the GoU funding 1.000.000 UGX and External Finance 2.757.122 UGX and the total budget FY 2015/2016 was set 3.757.122 UGX. Total budget difference from FY 2014/2015 to FY 2015/2016 is 28.192.749 UGX (Draft Estimate P: 224).

Markets and Agricultural Trade Improvements Programme (MATIP 2) for the FY 2014/2015 was given from GoU 8.857.525 UGX + External Finance 186.249.482 UGX. Total for last budget year 195.107.007 UGX. FY 2015/2016 from GoU is 8.275.525 + External Finance 80.987.12. Total is 89.262.647 UGX (Draft Estimate P: 225). Difference between FY 2014/2015 versus 2015/2016 is 105.844.360 UGX in cuts and it’s because of less External Finances from the year before.

Total to Ministry of Local Government:

FY 2014/2015 the GoU 32.091482 UGX + External Finance 191.619.482 the total for the year is 223.710.964 UGX (Draft Estimate P: 232).

FY 2015/2016 the GoU 31.135.358 UGX + Eternal Finance 84.91712 the total for the year is 116.052.449 UGX (Draft Estimate P: 232).

Local Government Finance Commission:

Grand total for FY 2015/2016 is 5.083.375 UGX (Draft Estimate P: 854).

Ministry of Lands, Housing and Urban Development:

Albertine Region Sustainable Development Project for the FY 2015/2016 set for 6.767.783 which is external finance (Draft Estimate P: 234). Competitiveness and Enterprise Development Project [CEDP] last FY 2014/2015 totally GoU funding which was 8.884.098 UGX. In FY 2015/2016 the GoU where 8.814.098 UGX with the Eternal Finance was set to 10.280.000 which is totally of 19.094.098 UGX, the difference between the years is the 10.000.000 in External Finance (Draft Estimate P: 241). Capital Purchases from the Ministry for infrastructure projects is set for 6.767.783 UGX (Draft Estimate P: 246).

Total budget for the ministry was FY 2014/2015 set for 30.214.981 UGX and for FY 2015/2016 is now 41.950.419 UGX (Draft Estimate P: 253).

Ministry of Education and Sports:

Uganda Teacher and School Effectiveness Project for FY 2014/2015 were given 8.061.000 UGX and FY 2015/2016 is set 90.395.134 UGX. And the External Finance for the project in the FY 2015/2016 is 88.355.134 UGX and was in FY 8.061.000 (Draft Estimate P: 255). So there is big difference between the budget years.  Emergency Construction of Primary Schools Phase II FY 2015/2016 set for 1.864.900 UGX. Albertine Region Sustainable Development Project was in the budget for FY 2014/2015 we’re 650.000 UGX and in FY 2015/2016 become 12.187.015 UGX. Skills Development Project for FY 2015/2016 is 19.930.030 UGX. Development of PTCs Phase II comes in the FY 2015/2016 is 5.377.824 UGX. Akii Bua Olympic Stadium get in the FY 2015/2016 is 1.000.000 UGX. National High Altitude Training Centre (NHATC) get in the FY 2015/2016 is 5.829.800 UGX (Draft Estimate P: 256).

Total budget for the Ministry was FY 2014/2015 set for 415.057.518 UGX and for FY 2015/2016 is now 400.556.219 UGX (Draft Estimate P: 283).

Education Service Commission:

Grand total for FY 2015/2016 is 5.789.344 UGX (Draft Estimate P: 741).

Universities:

Busitema University:

Grand total for FY 2015/2016 is 21.337.135 UGX (Draft Estimate P: 583).

Muni University:

Grand Total for FY 2015/306 is set 10.148.045 UGX (Draft Estimate P: 715).

Makerere University:      

Project 1250 Support to Innovation – EV Car Project for FY 2015/2016 is 8.220.610 UGX (Draft Estimate P: 762). Project 1343 SPEDA II cost in FY 2015/2016 is 1.058.000 UGX. Grand Total for FY 2014/2015 is 201.606.596 UGX (Draft Estimate P: 765).

Makerere University Business School:

Grand Total for FY 2015/2016 is 49.652.302 UGX (Draft Estimate P: 777).

Mbarara University:

Grand total for FY 2015/2016 is 49.652.302 UGX (Draft Estimate P: 774).

Kyambogo University:

Grand total for FY 2015/2016 is 73.828.998 UGX (Draft Estimate P: 783).

Gulu University:

Grand total for FY 2015/2016 is 26.718.718 UGX (Draft Estimate P: 864).

Ministry of Health:

A part of ‘Clinical and Public Health’ has located to the Shared National Services get 6.930.000 UGX for FY 2015/2016 (Draft Estimate P: 285).

Total to the Ministry is was FY 2014/2015 set for 581.740.966 UGX and for FY 2015/2016 is now 521.632.572 UGX (Draft Estimate P: 304). External Project Financing for the ministry was for FY 2015/2016 is 444.021.970 UGX (Draft Estimate P: 305).

Hospitals:

Mulago Hospital Complex:

Management – Incapacity, death benefits and funeral expence: For FY 2015/2016 is 600.00. Staff training for the FY 2015/2016 is 486.656 UGX (Draft Estimate P: 926).

Grand total for FY 2015/2016 is 53.809.703 (Draft Estimate P: 924).

Butabika Hospital:

Grand total for FY 2015/2016 is 9.702.815 UGX (Draft Estimate P: 929).

Arua Referral Hospital:

Grand total for FY 2015/2016 is 5.167.001 UGX (Draft Estimate P: 935).

Fort Portal Referral Hospital:

Grand total for FY 2015/2016 is 5.787.777 UGX (Draft Estimate P: 942).

Gulu Referral Hospital:

Grand total for FY 2015/2016 is 6.095.645 UGX (Draft Estimate P: 949).

Hoima Referral Hospital:

Grand total for FY 2015/2016 is 4.906.560 UGX (Draft Estimate P: 955).

Jinja Referral Hospital:

Grand total for FY 2015/2016 is 5.995.690 UGX (Draft Estimate P: 962).

Kabale Referral Hospital:

Grand total for FY 2015/2016 is 4.477.995 UGX (Draft Estimate P: 969).

Masaka Referral Hospital:

Grand total for FY 2015/2016 is 5.359.433 UGX (Draft Estimate P: 976).

Mbale Referral Hospital:

Grand total for FY 2015/2016 is 6.723.347 UGX (Draft Estimate P: 982).

Soroti Referral Hospital:

Grand total for FY 2015/2016 is 4.869.977 UGX (Draft Estimate P: 988).

Lira Referral Hospital:

Grand total for FY 2015/2016 is 4.344.172 UGX (Draft Estimate P: 996).

Mbarara Referral Hospital:

Grand total for FY 2015/2016 is 6.779.132 UGX (Draft Estimate P: 1002).

Mubende Referral Hospital:

Grand total for FY 2015/2016 is 4.756.488 UGX (Draft Estimate P: 1008).

Moroto Referral Hospital:

Grand total for FY 2015/2016 is 3.214.118 UGX (Draft Estimate P: 1013).

Naguru Referral Hospital:

Grand total for FY 2015/2016 is 5.800.972 UGX (Draft Estimate P: 1019).

Uganda Blood Transfusion Service:

Safe Blood Provision for FY 2015/2016 is 2.517.065 UGX (Draft Estimate P: 878). Regional Blood Banks for FY 2015/2016 is 5.432.786 UGX (Draft Estimate P: 879). Grand total for FY 2015/2016 is 8.414.084 UGX (Draft Estimate P: 876).

Uganda AIDS Commission:

Grand total for FY 2015/2016 is 7.747.968 UGX (Draft Estimate P: 563).

Uganda Cancer Institute:

Grand total for FY 2015/2016 is 17.040.925 UGX (Draft Estimate P: 614). External funding from ADB to UCI which is 3.329.460 (Draft Estimate P: 620).

Uganda Heart Institute:

Grand total FY 2015/2016 is 14.282.367 UGX (Draft Estimate P: 621).

National Medical Stores:

Grand total FY 2015/2016 is 218.614.467 UGX (Draft Estimate P: 626).

Health Service Commission:

Grand total for FY 2015/2016 is 4.169.557 UGX (Draft Estimate P: 753).

Ministry for Trade, Industry and Cooperatives:

Soroti Fruit Factory in the FY 2014/2015 was 4.846.906 UGX and in FY 2015/2016 set to10.482.787 UGX (Draft Estimate P: 306).

Grand Total for the Ministry in FY 2014/2015 was 19.450.781 UGX and in FY 2015/2016 set to 25.594.837 UGX (Draft Estimate P: 322).

Uganda Land Commission:

Grand total for FY 2015/2016 is 15.697.657 UGX (Draft Estimate P: 902).

Ministry of Works and Transport:

Entebbe Airport Rehabilitation Phase 1 FY 2015/2016 is 252.875.768 UGX (Draft Estimate P: 324).  Earth Moving Equipment Japan for FY 2015/2016 is set for 479.281.115 UGX, the GoU has 69.999.740 UGX the rest was 409.281.375 UGX (Draft Estimate P: 325). Transfers to other govt. Units (Capital) – FY 2015/2016 is 261.745.768 UGX, GoU are 8.870.000 UGX and the rest External Finance 252.875.768 UGX. Investmnt (Captial Purchase) – Machinery and equipment: FY 2015/2016 is set for 483.631.055 UGX. GoU is 73.349.680 and External Financing is 409.281.375 UGX (Draft Estimate P: 327). East African Trade and Transportation Facilitation – Construction/Rehabilitation of Railway Infrastructure – Other Structures: FY 2014/2015 we’re 7.000.000 UGX and in FY 2015/2016 is 450.000 UGX (Draft Estimate P: 333). New Ferry to replace Kabalega – Opening South both years FY 2014/2015 and FY 2015/2016 totally for both years 2.000.000 UGX (Draft Estimate P: 334). New Standard Gauge Railway Line the budget for FY 2014/2015 was 5.620.000 UGX and in FY 2015/2016 it’s now 3.500.000 UGX (Draft Estimate P: 335). Capacity Enhancement of KCCA in Management of Traffic in the FY 2015/2016 is 1.970.000 UGX. Entebbe Airport Rehabilitation Phase 1 in the FY 2015/2016 is 252.875.768 UGX (Draft Estimate P: 336). Master Plan on Logistics in Northern Economic Corridor in the FY 2015/2016 is 3.290.000 UGX. Gulu Municipal Council Roads (Preparatory Survey) in the FY 2015/2016 is 1.090.000 UGX (Draft Estimate P: 337). Redevelopment of State House at Entebbe in the FY 2015/2016 is 1.500.000 UGX (Draft Estimate P: 342).

The ministry grand total was FY 2014/2015 is 122.364.181 UGX and in FY 2015/2016 is 837.629.393 UGX (Draft Estimate P: 357).

Uganda National Roads Authority:

Construction of RD Agency HQs budgeted to 10.000.000 UGX is FY 2015/2016. Design Kyenjojo-Hoima-Masindi-Kigumba (238km) was budget in FY 2014/2015 was 65.000.000 UGX and it was FY 2015/2016 is 104.400.000 UGX. Kampala Entebbe Express Highway was set for FY 2014/2015 was 130.000.000 UGX to FY 2015/2016 is 233.140.000 UGX. Kampala Flyover for FY 2015/2016 is 19.630.000 UGX. Construction of 66 Selected Bridges for FY 2015/2016 is 10.871.944 UGX. Upgrading of Muyembe-Nakapiripirit (92 km) for FY 2015/2016 is 22.600.000 UGX. Total Development Budget for the UNRA is for FY 2015/2016 is 1.725.000.114 UGX (Draft Estimate P: 595). Grand total for FY 2015/2016 is 1.761.658.654 UGX (Draft Estimate P: 611).

Financial from External support for some of the Projects of UNRA:

Design for the New Nile Bridge at Jinja is supported from Japan. Design Kyenjojo-Hoima-Masindi-Kigumba (238km), Upgrading Rukungiri-Kihihi-Ishasha/Kanungu Road and Upgrading Mbale-Bubulo-Lwakhakha Road is financed from the African Development Bank. Kampala Flyover is supported from Japan (Draft Estimate P: 613).

Road Fund:

Grand total for FY 2015/2016 is 428.101.919 UGX (Draft Estimate P: 634).

Ministry of Energy and Mineral Development:

Kampala-Entebbe Expansion Project was in FY 2014/2015 is 4.920.000 UGX and in FY 2015/2016 is 53.493.000 UGX.  Large Hydro power infrastructure FY 2015/2016 is 2.314.840.000 UGX. The Hydro power projects are: Isimba HPP, Karuma Hydroelectricity Power Project, Muzizi Hydro Power Project and Nyagak III Hydro Power Project (Draft Estimate P: 359). Strengthening the Development and Production Phases of Oil and Gas Sector is set for budget FY 2015/2016 are 63.145.000 UGX (Draft Estimate P: 402).

Isimba HPP and Karuma Hydroelectricity Power Project is Financed from China. The Kampala-Entebbe Expansion Project is financed Germany Federation Republic. The Muzizi Hydro Power Project was financed from France. Development and Production Phases of Oil and Gas Sector are financed through Norway (Draft Estimate P: 402).

The ministry grand total was FY 2014/2015 is 1.775.909.953 UGX and in FY 2015/2016 is 2.723.629.310 UGX (Draft Estimate P: 401).

Uganda Industrial Research Institute:

Grand total for FY 2015/2016 is 14.340.221 UGX (Draft Estimate P: 578).

Rural Electrification Agency:

Grand total for FY 2015/2016 is 91.107.608 UGX (Draft Estimate P: 690). Energy for Rural Transformation (ERT) II- Rural Electrification for FY 2015/2016 is 10.944.108 UGX (Draft Estimate P: 693).

Ministry of Gender, Labour and Social Development:

Uganda Women Entrepreneurs Fund (UWEP) funded through the GoU for the FY 2015/2016 is 1.000.000 UGX. Youth Livelihood Programme (YLP) for the budget FY 2015/2016 is set for 33.000.000 UGX (Draft Estimate P: 403). Social Assistance Grant for Empowerment – Sector Institutions and Implementing Partners Supported – SAGE beneficiaries: FY 2015/2016 set to 6.800.746 UGX. Youth Livelihood Programme (YLP) we’re set budget for FY 2015/2016 is 33.000.000 UGX (Draft Estimate P: 418).  Sector Institutions and Implementing Partners Supported – o/w transfers to LGs and KCCA for youth projects FY 2015/2016 is set 27.915.180 UGX (Draft Estimate P: 417).

Grand total for the Ministry was for FY 2014/2015 we’re  62.792.359 UGX and in FY 2015/2016 is now 70.398.881 UGX (Draft Estimate P: 420).

Equal Opportunity Commission:

Grand total for FY 2015/2016 is 4.450.000 UGX (Draft Estimate P: 701).

Uganda Human Rights Commission:

Grand total for FY 2015/2016 is 11.700.407 UGX (Draft Estimate P: 559).

Ethics and Integrity:

Grand total for FY 2015/2016 is 5.429.296 UGX (Draft Estimate P: 590).

Ministry of Water and Environment:

Support to RWS Project: FY 2014/2015 was set to 29.997.000 UGX and the next budget year FY 2015/2016 is 45.097.000 UGX. Piped Water in Rural Areas: FY 2015/2016 set to 16.675.333 UGX. Urban Water Supply & Sewerage was set for FY 2014/2015: 409.007 UGX and in FY 2015/2016 it is 3.389.007 UGX. Protection of Lake Victoria-Kampala Sanitation Program is set 39.013.434 UGX in FY 2014/2015 and in FY 2015/2016 is set 70.629.000 UGX. Kampala Water Lake Victoria Water and Sanitation Program were set to be 17.899.244 UGX in FY 2014/2015 and in FY 2015/2016 is set 47.930.965 UGX (Draft Estimate P: 421). Lake Victoria Environment Management Project was set 10.821.000 UGX for FY 2014/2015 and in the FY 2015/2016 is 25.257.000 UGX. Water Management and Development Project is set to 2.718.539 UGX in FY 2014/2015 and now in FY 2015/2016 is 5.617.000 UGX. Uganda National Meteorological Authority (UNMA) budget for 2015/2016 set for 12.661.000 UGX (Draft Estimate P: 422)

Grand total for the ministry is the 340.742.483 UGX in FY 2014/2015 and in FY 2015/2016 is set to be totally 436.164.599 UGX.

National Forestry Authority:

Support to National Forestry Authority – Agricultural Supplies in the FY 2015/2016 is 1.919.085 UGX (Draft Estimate P: 912).  Grand total for FY 2015/2016 is 23.264.295 UGX (Draft Estimate P: 908).

Ministry of Information and Communication Technology:

Grand total to the ministry in FY 2015/2016 is set to be 11.215.240 UGX (Draft Estimate P: 496).

National Information Technology Authority:

Project 1014 National Transmission Backbone project: FY 2015/2016 set for 5.050.058 UGX

(Draft Estimate P: 711). Grand total for NITA for FY 2015/2016 is set for 39.200.998 UGX (Draft Estimate P: 714).

Ministry of Tourism, Wildlife and Antiques:

Establishment of Regional Satelite Wildlife Conservation in FY 2015/2016 is set 5.040.000 UGX (Draft Estimate P: 506). Mt. Rwenzori Tourism Infrastructure Development Project (MRTIDP) in FY 2015/2016 is set to 864.027 UGX. Development of Museums and Heritage Sites for Cultural Promotion in FY 2015/2016 is set to 686.000 UGX. Establishment of Lake Victoria Tourism Circuit in FY 2015/2016 is set 300.000 UGX (Draft Estimate P: 513). Development of Source of the Nile in FY 2015/2016 is set to 680.000 UGX (Draft Estimate P: 514). Grand total to the ministry for FY 2015/2016 is 17.837.396 UGX (Draft Estimate P: 517).

Uganda Tourist Board:

Grand total FY 2015/2016 is 11.403.457 UGX (Draft Estimate P: 629). Advertising and PR from FY 2014/2015 was 1.287.601 UGX to FY 2015/2016 is 4.188.280 UGX (Draft Estimate P: 630).

Judiciary:

Grand total to FY 2015/2016 in 92.979.388 UGX (Draft Estimate P: 525).

Institutions and Government organization on the Budgets:

Electoral Commission:

Printing, Stationery, Photocopying and Binding in FY 2015/2016 is set to 105.686.649 UGX. Capital Purchases in Machinery and Equipment in FY 2015/2016 is set to 30.000.000 UGX (Draft Estimate P: 528). Management of Election in FY 2015/2016 is set 234.967.009 UGX and in FY 2014/2015 is set 141.688.692 UGX (Draft Estimate P: 530). Grand total to the Electoral Commission for the FY 2015/2016 is set to be 265.580.684 UGX and in FY 2014/2015 it was 150.580.684 UGX (Draft Estimate P: 531).

Inspectorate of Government (IG):

Grand total budget to FY 2015/2016 is set to 37.720.116 UGX (Draft Estimate P: 538).

Parliamentary Commission:

In the FY 2015/2016 the MPS are budgeted 201.164.917 UGX (Draft Estimate P: 540). Contribution to other Organizations –   Gov’t Contribution to EALA- Arusha set for FY 2015/2016 is set 7.257.179 UGX (Draft Estimate P: 542). Administration and Transport Logistics set for 2015/2016 is set 2.905.774 (Draft Estimate P: 551). Grand total to the Parliamentary Commission for the FY 2015/2016 is 301.697.537 UGX (Draft Estimate P: 552).

Law Reform Commission:

Grand total for the FY 2015/2016 is 8.920.536 UGX (Draft Estimate P: 553). The biggest expense from last FY 2014/2015 was 290.405 UGX and in FY 2015/2016 is 1.191.699 UGX (Draft Estimate P: 553-554).

National Planning Authority:

Grand total for FY 2015/2016 is 14.613.907 UGX (Draft Estimate P: 567).

Law Development Center:

Grand total for FY 2015/2016 is 10.110.804 UGX (Draft Estimate P: 572).

Uganda Registration Service Bureau:

Grand total for FY 2015/2016 is 13.715.034 UGX (Draft Estimate P: 638). Up from last FY 2015/2016 on the ‘Rent – (Produced Assets) to private entities’ is 1.702.400 UGX (Draft Estimate P: 639).

National Citizenship and Immigration Control:

Grand total for FY 2015/2016 is 139.589.276 UGX (Draft Estimate P: 643). The biggest post was Capital Punishment – Machinery and equipment which is 76.396.918 UGX in this FY (Draft Estimate P: 644).

Kampala Capital City Authority:

2ND Kampala Institutional and Infrastructure Development Project FY 2015/2016 is 82.151.560 UGX (Draft Estimate P: 661). Urban Road Network Development total for the FY 2015/2016 is 139.204.569 UGX (Draft Estimate P: 661). Education and Social Service for FY 2015/2016 is 36.155.136 UGX (Draft Estimate P: 666). Community Health Management for FY 2015/2016 is 9.718.674 UGX (Draft Estimate P: 674). Sanitation and Environmental Services for FY 2015/206 is 13.578.579 UXG (Draft Estimate P: 675).  Gender, Community and Economic Development for FY 2015/2016 is 2.368.822 UGX (Draft Estimate P: 678). Economic Policy Monitoring,Evaluation & Inspection for FY 2015/2016 is 104.749.162 UGX (Draft Estimate P: 681).

Uganda National Examination Board:

Grand total for 2015/2016 is 69.869.913 UGX (Draft Estimate P: 722).

Treasury Operation:

One major reason why the budget was different between years is that 250.000.000 UGX was given to ‘Contribution to Autonomous Institutions’ (CAI) (Draft Estimate P: 728). Grand total between the FY was in 2014/2015 was 1.222.034.703 UGX and in 2015/2016 is 2.088.896.738 UGX. Which is total difference: 866.862.035 UGX, parts of this the CAI (Draft Estimate P: 731).

Auditor General:

Programme 05 Directorate of Value for Money and Specialised Audits for FY 2015/2016 is 4.507.922 UGX (Draft Estimate P: 736). Grand total for the Auditor General for FY 2015/2016 is 46.818.861 UGX (Draft Estimate P: 737).

Directorate of Public Prosecution:

Grand total for FY 2015/2016 is 27.934.069 UGX (Draft Estimate P: 748).

Uganda Management Institute:

Grand total for FY 2015/2016 is 22.763.029 UGX (Draft Estimate P: 784).

Uganda Revenue Authority:

Grand total for FY 2015/2016 is 238.534.130 UGX (Draft Estimate P: 788).

Uganda Bureau of Statistics:

Grand total for UBOS in FY 2015/2016 is 65.543.461 UGX (Draft Estimate P: 827).

Public Service Commission:

Grand total for FY 2015/2016 is 4.997.601 UGX (Draft Estimate P: 849).

Judicial Service Commission:
Grand total for FY 2015/2016 is 3.209.142 UGX (Draft Estimate P: 859).

NAADS Secretariat:

Government Purchases for FY 2015/2016 is 177.704.389 UGX. Grand total for FY 2015/2016 is 183.974.681 UGX (Draft Estimate P: 881).

Public Procurement and Disposal of Public Assets Authority (PPDA):

Grand total for FY 2015/2016 is 10.722.548 UGX (Draft Estimate P: 887).

Uganda National Bureau of Standards:
Grand total for FY 2015/2016 is 20.728.194 UGX (Draft Estimate P: 892).

Peace!

Reference:

Annex 2B: Allocation of Additional resources FY 2015/2016

Republic of Uganda – DRAFT ESTIMATES OF REVENUE AND EXPENDITURE (RECURRENT AND DEVELOPMENT) – FY 2015/2016 – VOLUME I: CENTRAL GOVERNMENT VOTES – FOR THE YEAR ENDING ON THE 30TH JUNE 2016

Press Release: Somali Police Cheif commends outgoing AMISOM FPU contigent (03.08.2015)

Amison03082015P1Amison03082015P2Amison03082015P3

Press Statement: The SPLM/SPLA objects to the inclusion of the Republic of Uganda in the Committee constituted by the AU-PSC on the Repot of African Union Commission of Inquiry on South Sudan conflict (24.07.2015)

SPLM2507

Uganda – MPS Defence budget for FY 2015/2016 – Quotes and Outtakes:

NTVUgandaUPDF

Here are the quotes and outtakes from the Ministry of Defence in Uganda. Government of Uganda has with this Ministerial Policy Statement (MPS) it shows the value of the Defence Ministry. So here we go to show it!

Vision of the Ministry:

“The vision and commitment of Ministry of Defence is to transform and sustain the UPDF into a modern, professional, efficient and accountable force” (MPS P: 7).

Internal Security Environment:

“The tensions which erupted in the Rwenzori Sub-region in July 2014 were contained by the Security forces. In order to fundamentally resolve the basis of the tensions” (…) “Disarmament Operations in Karamoja have largely been successful and as a result this year’s Tarehe Sita celebrations were held in the Karamoja sub region under the theme” (…) “Terror threats from Al-Shabaab and ADF still persist. Some murders particularly in Eastern Uganda have been linked to ADF elements” (MPS P: 8).

External Security Environment:

“To the north of the country, the security situation in South Sudan remains volatile. Fighting between the warring parties continued despite the IGAD mediation process in Addis Ababa, clashes in the states of Jonglei, Unity and Upper Nile persist” (…) “On the western frontier of our border with DRC, the threat of ADF persists despite ongoing operations by the DRC’S national army, the FARDC and the Intervention brigade of the UN” (…) “UPDF maintains strategic deployments along the border and an intelligence liaison team in Beni town to monitor this security situation. As reported last year, the M23 was militarily defeated and a political agreement reached between the DRC Government and the M23. However, the implementation of the agreed declarations in Nairobi has stagnated. For example of all the M23 ex-combatants that took refuge in Uganda only 182 have been repatriated and over 1000 are still in Uganda” (…) “the Counter LRA Operations. In the course of the year no agreement was reached in regard to Uganda joining the UN multidimensional Integrated Stabilization Mission for CAR (MINUSCA)” (…) “RTF).Counter LRA Operations in the course of the year were remarkable. Twenty five (25) rebels were killed and seven(7) forced to defect including Brig Dominic Ongwen, who is now being prosecuted by the ICC in the Hague. Over 100 abductees, including women and children were rescued from LRA captivity” (…) “In Somalia, the African Union Mission in Somalia (AMISOM) continues to register achievements. Key coastal towns, including the Port of Barawe which was the lifeline of Al-Shabaab, were captured. Consequently the 5 sea route portion between the ports of Mogadishu and Kismayo is now under the control of AMISOM forces” (MPS P: 9-11).

Public Enterprise:

“The Uganda Air Cargo Corporation had its license withdrawn by the CAA in the general operation to enforce standards. For most of the year therefore the corporation has suffered heavy losses” (…) “the National Enterprises Corporation (NEC), performance has not been to the desired standards. Accordingly a new managing director is being appointed and the corporation will fundamentally get restructured” (MPS P: 12).

Logistical Support:

“Food stuffs and agricultural products were procured to feed troops on special operations, patients, trainees and ceremonial functions” (…) “It should however be noted that the budget allocation on food is 18.5bn against a requirement of 53bn hence creating a shortfall in the Ministry’s budget. There is need for an increment on the Ministry’s food budget” (…) “the Ministry to enjoy economies of scale and also ensure that the whole force is fully dressed at once. This costed the Ministry 22bn worth of uniforms against the allocated budget of 11b” (…) “Vehicles The Ministry continued servicing the outstanding debt obligation in respect to the acquisition of 109 vehicles. Payment for the same is expected to be completed in FY 15/16. Routine servicing which included procurement of spares and supplies of all vehicles and equipments to keep them operational was undertaken to enable smooth operation of the Ministry. With a meager budget of Shs. 1.573bn, single line tyre dressing of MoD/UPDF vehicles was also undertaken” (…) “Air force continued to consolidate its capability through routine maintenance, overhaul fabrication and procurement of service parts. Assorted workshop and ground tools were acquired to further strengthen the UPDAF capability to conduct routine maintenance. A total of 7.2bn” (…) “In order to facilitate training, the movement of troops and delivery of logistics at the required time and place, the ministry is projected to procure POL products worth Shs 31.976bn against an allocation of 10.3bn” (MPS P: 15).

Welfare:

“Decentralization of payment of government employee’s salaries to line ministries, the ministry continued to use the Integrated Personnel Payroll System (IPPS) to pay salaries of the public officers and pension/gratuity for the soldiers while the salary of the troops continued to be paid through the IRIMS. This has greatly improved payment of salaries as they were received before the 28th day of every month. During this FY 2014/15, the ministry plans to retire 1,112 personnel in phases” (…) “National Medical Stores (NMS), the ministry further strengthened the implementation of this directive by entering into a Memorandum of Understanding with National Medical Stores. Shs 3,019,523,250/= was remitted to NMS to cater for the ministry’s pharmaceuticals requirement” (MPS P: 16).

Infrastructure Development:

MPS Defence TableV1.1. - ExpendituresMPS Defence Infrastructure Development On going projects.

Planned Outputs:

“The UPDF will continue with routine border surveillance and further strengthen early warning mechanisms to deal with border insecurity and terrorist groups be it ADF, LRA or any other wherever they may be. UPDF will continue supporting the Uganda Police Force, whenever called upon, to enhance internal peace and security, and controlling the proliferation of Small Arms and Light Weapons (SALW)” (…) “In addition the UPDF will continue contributing to regional peace and stability through regional bodies. Under the African Union and IGAD, continued progress will be made to build the East African Standby Force. The ministry will continue participating in other regional bodies like EAC, IGAD and ICGLR to address collectively regional peace and security issues” (MPS P: 18).

Logistical support under planned outputs:

“Refurbish and maintain UPDAF Aircrafts: UPDF has a number of aircrafts that require regular refurbishment, maintenance, overhaul of engines as well as acquisition of spare parts. In order to enhance UPDAF capability, the MoD will focus on refurbishing and maintaining of the aircrafts” (…) “Machinery and equipment: The Ministry will continue to establish a combination of contracted and sustainable maintenance plan for its equipment in Mogadishu (…) “Defense Force Shop: Sale of duty free building materials to troops and their families and diversity stocks. The shop has 08 outlets (AMISOM)” (…) Defense Strategic Infrastructure Investment Plan (DSIIP): During this planning period, the DSIIP will continue to guide infrastructure development, resource allocation and prioritization of development. The DSIIP will focus on the construction of the referral ; construction of 30,000 housing units for soldiers” (MPS P: 19-21).

Cross cutting issues:

“The UPDF Spouses desk which falls under the Chieftaincy of Political Commiseriate aims at improving the welfare of families of the UPDF soldiers in all Units country-wide through empowering them with skills that will improve their livelihood.With a budget of Shs.40m” (MPS P: 23).

MPS Defense 25MPS Defense 26MPS Defense 27MPS Defense 28MPS Defense 29MPS Defense 30MPS Defense 32MPS Defense 33MPS Defense 34MPS Defense 35MPS Defense 36MPS Defense 60MPS Defense 78MPS Defense 81MPS Defense 84

Afterthought:

The opinions and wishes from the Statement are clear. You can see the wishes of the UPDF. The way the government wishes to use and function of the army. From being an important part of the African Union peace missions. To also becoming vital in the close area like in South Sudan where even the advice from the Parliament is to pull out. We all know that isn’t going to happen because of the relationship between Museveni and Kiir. They have fought together and helped each other. Now Museveni supports his neighbor and the SPLM. The UPDF are also already in Somalia and Central African Republic as well. When you see the budget for things you well ask yourself. As well as the Classified Equipment are big number and you starting to wonder what that money goes for. Especially when they call it ‘Classified’ and why it’s that size of cash. But I think the rest of the numbers talk for them self. Peace.

A honest letter to the Ugandan President Museveni after being snubbed by the U.S. President Obama

MuseveniObama

Dear His Excellency (H.E.) President Yoweri Kaguta Museveni!

I write to you since in the recent day you got rejected to meet with the American President Barrack Obama who will visit Kenya on the 24. July 2015. This is today! And he wouldn’t meet you in Kenya!

It must be a slap on your face Mzee that your ally in America is saying “no to see you”. When he is in your neighborhood. When he steps on land in East African Community and will not see you. Your sending troops for them into Central African Republic on the goose hunt for your lost cause for so long in Northern Uganda. The famous LRA and Joseph Kony! The one man that even the American army want to get rid-off! Then they failed together with Ethiopia in Somalia where you have been charged together to fight Al-Shabab. The Americans are certainly happy that you do this and don’t cost them much compared to send their own troops.

Mzee there many reasons why President Barrack Obama is saying no to see you. He is firstly meeting Kenyan president Uhuru Kenyatta. Who is turning into Americans ally in the area of late, even if you fight wars for them and use enormous levels of resources as well, still he doesn’t expect your courtesy call. You have been in charge of Uganda since October 1986. Obama is in his last term he has been lucky to only be Head of State in the country from 2009. He is not like you a true and tested leader like you! Even if he has Nobel Peace Prize. He got before really stepping into the office.

He has also been parts of wars. You have sent your own people and now they don’t even talk to you. I am not sure is because you have latest visits abroad to any great western powers. Was to Russia and then you started to buy army equipment from them instead of American. That is sure a slap to the face or the U.S. Arms producers, the cancelling of a planned military exercises on the 19. June of 2014, because of the “Anti-Gay Bill”! Since then it’s been cold from the American government and the White House. Then you’re buying expensive military equipment for your army from Mzee Putin of Russia. It’s okay that Obama had a burger with his predecessor Medvedev. Still with the Ukraine situation and Putin back in the hot-seat the turning relationship has also hit a snag. So don’t get the possibility to eat a burger in Nairobi with Obama.

So you’re now hurt by the almighty Obama. I am sure you wished yourself was directly mediating in Burundi, instead of the Defense Minister Crispus Kiyonga.  You’re in Uganda dealing with your own election then being there looking good for the press. The sad thing for you is to see your former weapon brothers going against you like Jean Patrick Amama Mbabazi. Who is trying to take your candidacy in your own party the NRM! And even worse for you is that the man who has fought against you for so long Dr. Kizza Besigye has gotten crowds where-ever he steps and moves around in the country. And your methods of chasing the opposition like a headless chickens, don’t help you at all Mzee Museveni. You think it does, but up to the election, you just look foolish to all the pundits. You look like a weak man instead of the man who has been in power since the 80s. You have cut loose so many big men before going into power, like Gen. Oyite Ojok, Yusuf Lule, Tito Okello, Milton Obote and Idi Amin. Before that the country was in shambles and you have made in some kind of peace. You could have been a hero! If you had left after your two first terms then you have been left with a decent legacy. That’s would have been since you gave the country a constitution and peace nearly on all places. You struggled with the Northern Uganda. And still continue to pay back to SPLM and South Sudan because of their help in the area. This is not popular that for the U.S. that your involved there without an official mandate.

I am sure that there are more issues for why Barrack Obama isn’t in your presence right now Mzee Museveni. So you are not the poster-boy and future leaders of Africa in 80s and beginning of the 90s. Where you and Kagame your former allies was seen a breath of fresh air! Now you are not the one who the west looks for hope in the continent. And you wonder why? That is because history repeat itself and you have broken your own words time and time again.

I am sure it’s been fun to have over the President of Zambia Edgar Lungu. But that is no Barrack Obama and with the power of U.S. And he could help you with military equipment. Though they not doing business as the Russians and taking pieces of the future oil industry instead of money. So I am sure that hurt your pride Mr. President. But know that the party has still fractions that are loyal to you because you pay them. The leaders who showed you support after last election victory was President Mugabe of Zimbabwe, former Kenyan President Daniel Arap-Moi, the now former Kenyan President Mwai Kibaki, Deputy Prime Minister Uhuru Kenyatta, President of South Sudan Salva Kiir and the Somali President Sheik Sharif Sheik.

But none of this can help you as the American President and honor your presence. You have run a country as long as I have lived. And to get turned down and spend time with newcomer from Zambia must be low-key moment for you. Since you have been so useful to the American government and fought the wars they don’t want to. I am sure you’re having a bad day. Though not saying it since your hurt and parts of you might wish you didn’t visit Russia last time. And you should have tried to mend up with Americans who has supported you through the 90s and 00s. That refinery has cost you and the pipeline for the oil has been dodgy as well. But you’re so close and just need another term to the Lake Albert becoming your black gold. Until then you just has to use the well-used methods of keeping people in order and follow the party line. Though this doesn’t help you with your relationship with the American Government unless you break your principle and rules. Which is sacred to you and that is understandable. The American president only has eight years to do his thing and then he is gone. You have sit eight years in power when it was 1994. By then you we’re support Kagame and the RPA in Rwanda. So the issues with America should go over. You have their old weapons and know how they call on you when they wars they don’t want to fight. So your not best buddies today, but maybe during next term if their getting a republican president in the White House he might support you, because he will only care about policy, not about who as long as he looks good during the whole deal. Tomorrow is another day Mr. President His Excellency Yoweri Kaguta Museveni! You will shine again. Believe that and by now your mustard seed should be a big plant and give a good yield. Though Dr. Kizza Besigye is stealing your crops, don’t worry people will vote for you, even if they don’t know they do! The Electoral Commission is your people, you’re safe and good. You just have to wait until the U.S. need you again. Then you will get granted to meet with the Nobel man himself. Maybe even in your own Statehouse in Entebbe.

There is reports you get a courtesy call in Ethiopia, but for a great man like you that feels like you been snubbed twice already by the American President. I am sure your hurt and tried to patch up the hurt with a meeting with the Zambian President to be the big shot in East Africa. While your neighbors president get him directly for visits. Uhuru Kenyatta the Kenyan President and also meeting with Hailemariam Desalegn Boshe the Prime Minister of Ethiopia in their homelands. While you have travel to Addis Ababa to see him for a short time and not an official visit like they are getting. And you have been their ally for decades and when they’re in your area they don’t show you respect you deserve. For God and for country!

Best Regards:

From the Writer of this blog

Third term extravanganza in East Africa – Country for country

stock-footage--s-newsreel-story-roosevelt-wins-third-term

In this day and age we have peoples in power who wish to stay there. They stay in power on overtime. They change the constitution and amendments to make sure that they can get re-elected. The irony is that many of this leaders accepted when they came into power the new constitutions and laws. After a while and their terms running out they have to switch the laws for their own purpose. The laws are supposed to be for the best of their countries and not one person or party. Therefore you see reactions in these nations as they see that their leaders continue at any cost. This makes people to react like they did in DRC in January while Joseph Kabila opted for a third term. The coup in Burundi was another type of reaction to their president Pierre Nkurunziza changed the law so he could run for a third term. Also the public reacted to it. It’s also happening in Rwanda where the RPF and their president Paul Kagame will change laws so he can run for a third term. They are following the suit of President Museveni in Uganda. Who came to power with the rifles in 1986 and made a constitution in 1995. And abolished the term limits in 2005. And is soon running again in 2016, in this piece I will describe the position of the countries land by land in the East Africa. This is from Burundi to Uganda.

main-cartoon-26-05-2015

Burundi:

In the end of April in 2015 the Constitutional Court made an amendment that gave CNDD-FDD party flagbearer Pierre Nkurunziza an possibility to stand as a president for the third term. His first term was he selected by the parliament and not the people in 2005, the second term he was elected through elections in 2010. So this spring the President made moves to secure power again and break with the Arusha Agreement to secure himself more years as president of Burundi. There was supposed to be an election after the new amendment was passed this year. Parts of the military went on a coup d’etat when the President Nkurunziza was in Tanzania on an EAC conference. The Coup was squashed quickly. But the protest has continued. The election has been postponed. There has been refugees going to DRC, Tanzania and Rwanda following the protest against a third term for Pierre Nkurunziza. But the opposition and the protest against the third term has not stopped in the country since the last election. The violence between government army and the protesters are continuing. And the official election for his third term is still to come.

KabilaCartoon

Democratic Republic of Congo:

In Democratic Republic of Congo the son of the late assassinated Laurent-Desire Kabila, Joseph Kabila has been in charge since 2001. His first election was won in 2006. Already in 2011 he got won the election the second time. Now since the spring Joseph Kabila has worked on making sure he could get a third term. There been responses from opposition and NGOs. #Telema protest happened in January when the draft for third term was made. Still been silence from the government since then. But there has been movement again during late summer and July.

kenya2015-cartoon3

Kenya:

In Kenya they got a new constitution in 2010. The constitution specifies that the President have a certain limit of two terms. The last President of Kenya was Mwai Kibaki he led the country from 2002-2007. He won the second election in 2007 that lasted to 2013. In 2013, some issues from the opposition to the winning election of Uhuru Kenyatta the son of the first president of the newly independent Kenya Jomo Kenyatta. So the Supreme Court handled the case and gave Uhuru Kenyatta and his Jubilee Alliance their stamp on the first term for him. There are no current plans of changing the 2010 constitution to abolish or change the levels of terms for presidents in Kenya.

KagameCartoon

Rwanda:

In Rwanda the RPA came to power after the genocide in 1994. After this the RPA became RPF is Rwandan Patriotic Front from the former Rwandan Patriotic Army. Paul Kagame was the Vice-President until 2000 when the National Assembly and government ministers elected him as president. In 2003 a new constitution came to force. Paul Kagame was relected in that year. Second election was in 2010 where he won in a landslide. Now he is working on tweaking the constitution to fix it so that Paul Kagame and the RPF can in power yet another term after next election.

KikweteCartoon

Tanzania:

Tanzania has a special place after Julius Nyerere was in charge of the country since independence from 1964 to 1985. The Constitution of Tanzania is from 1977. That says that the president can only be in charge for two terms of 5 years each. After Julius Nyerere reign this has been followed. The party that he started is still running the country. First was president after Nyerere was Ali Hassan Mwinyi from 1985 to 1995. After him came Benjamin Mpeka from 1995 to 2005. The recent President is stepping down Jakaya Kikwete after taking his two terms from 2005 to 2015. In the next election the Party of the Revolution (CCM) has choice been on the new president candidate John Magufuli. President Kikwete will not be like his neighbors who try to stay in power and make amendments to the constitution.

MuseveniandIdiAmin

Uganda:

Yoweri Kaguta Museveni came to power after a coup d’etat in 1986 to overthrow of Obote II and the interim government of Tito Okello who came with an army of rebels from Tanzania with support of Julius Nyerere. This was the NRA (National Resistance Army) who later became the NRM (National Resistance Movement). After being in power a long time the new constitution came into being 1995. The first presidential election in a one-part state was in 1996. The same was in 2001. Both of these elections President Museveni won landslides in the county. To change so that President Museveni could be voted in again, the Parliament abolished term limits that year and also opened for multiparty elections. In 2006 the first multiparty elections under the new regime happen and Museveni won a landslide in the election. The next election in 2011 was reported to be rigged by the regime and President Museveni won with 68%.. Right now he is preparing for yet another term as president of Uganda. After running the country since 1986 and he has “won” 4 elections and is making ready for his fifth. This election is going to be held in February 2016 and the nation is already gearing up for the primaries as we speak. In both the NRM party and also the opposition, though the Public Order Management Bill is putting restraint on dissidents from the NRM.

(This post was updated on 21.07.2015 – because of some wrong information. Its now corrected). Peace.

Press Release: Didier Reynders concerned about reported fighting in northern Burundi (11.07.2015)

DidrickPR1107P1DidrickPR1107P2

Corruption is always relevant – Shine a light on a few cases from this week.

the-file-is-corrupt-and-cannot-be-opened

“It’s interesting that these themes of crime and political corruption are always relevant” – Martin Scorsese

In this last week there been big corruption cases that have unfolded in the media. The biggest ones are FIFA officials and that former PM of Italy has been sentenced to jail for three years. Both of those cases are well addressed by all major media. So I don’t need to blast them. This here is more or less known. Therefore I write my peace quickly because well, corruption has to be put a lid on. If not you have to address it in the sunshine and let those who steal money from the common man get time to send them to the law and get a just verdict. The pursuit for quick money will not stop. But as long as there are money and an opportunity for some to earn an extra shilling for very little work and make some money or get kickbacks for buying something while working for the government. Well, we as a public can’t accept that. So here are cases all from the mountains of Norway to the delta of Nigeria unto the public perception on road building in Peru. Enjoy!

Earlier this week in Norway a four former executives of the fertilizer company Yara was sentenced and judged in a corruption case. The time they will spend in jail is from 6 months to 3 years depending on how involved the executive was. This case is involving the corruption accusations that the company bribed officials in India and Libya (Økokrim, 2015).

In the U.S. on the 10th of July the former Governor of Virgina Robert F. McDonnell stood trial in court for his a weird connection with a Richmond business man. That the former governor helped the businessman while getting paid to clear his own monies issues. He was already gotten to court in September last year and sentenced to 2 years in jail (Zapotosky, 2015).

In China the Communist Party continues to charge people on corruption. The latest man who has allegedly been corrupt is Patrick Liu a senior executive in the internet company of AliBaba. He isn’t charged for the actions he has done as an executive at AliBaba, but where he used to when he worked at the Social Network site Tencent (SkyNews, 2015).

In the Netherlands there been indicted six civil servants from the police department and defense ministry for taking bribes while purchasing vehicles and trucks for the representative ministry and department. The bribes came as kickbacks and foreign trips on the supplier’s paycheck. The whole total of suspects in this case is 47. So there will be more information to come during the next months (DutchNews, 2015).

In Malawi the President Mutharika and his personal aide Ben Phiri are central in a huge corruption case. This case involves the statehouse deals between Central Medical Stores Trust and the contract valued at MK1.4 Billion to Malawi Pharmacy Limited (Kangwele, 2015).

In Nigeria the former leader of the Head of Service of the Federation (HOS) Mr. Steven Oronsaye was recently charged for involvement in an N2.1bn graft case while being the head of the civil service. A part of the money (N1.2bn) that was siphoned away from the civil service was sent through the company of Global Services Limited and 2 persons connected to the company were also in court. It is also alleged that that Oronsaye siphoned N6.2bn from the pension fund through fake contracts and supplies that never got delivered to the civil service. They will again go to court on Monday the 13th of July in the meanwhile they are detained (Ejike-Abuja, 2015).

In Peru meanwhile the government heads are expected to have been corrupted while building the highway between Peru and Brasil. 71% of people believe corruption was involved while building the Interoceanic highway. The three involved officials are Alejandro Toledo and Alan Garcia. Even President Ollanta Humala is expected to corrupt as well over the building of the road (Ojeda, 2015).

Hope you got something out of it. It’s a worldwide phenomenon. Greed doesn’t sleep it just has many forms. And a quick buck is also something a person wishes. Peace.

Reference:

DutchNews – ‘Civil servants accused of corruption in vehicle purchase case’ (10.07.2015) link: http://www.dutchnews.nl/news/archives/2015/07/civil-servants-accused-of-corruption-in-vehicle-purchase-case/

Eijke-Abuja, Sunday – ‘EFCC files 24-count corruption charges against ex-Head of Service, Steve Oronsaye, 2 others’ (07.10.2015) link: http://tribuneonlineng.com/efcc-files-24-count-corruption-charges-against-ex-head-service-steve-oronsaye-2-others

Kangwele, Mike J. – ‘Mutharika, Ben Phiri in a 1.4bn. corruption scandal’ (10.07.2015) link: http://malawi24.com/2015/07/10/mutharika-ben-phiri-in-a-k1-4bn-corruption-scandal/

Ojeda, Hillary – ‘Pulso Perú: 71% believe Interoceanic Highway construction was corrupt’ (10.07.2015) link: http://www.peruthisweek.com/news-pulso-peru-survey-71-believe-construction-of-interoceanic-highway-was-corrupt-106983

SkyNews – ‘Alibaba Executive Held Over Corruption Claims’ (10.07.2015) link: http://news.sky.com/story/1516748/alibaba-executive-held-over-corruption-claims

Økokrim – ‘  Fire tidligere toppledere dømt i Yara-saken’ (07.07.2015) link: http://www.okokrim.no/fire-tidligere-toppledere-doemt-i-yara-saken

 

Zapotosky, Matt – ‘Ex-Va. governor McDonnell loses appeal of corruption convictions’ (10.07.2015) link: http://www.washingtonpost.com/local/dc-politics/appeals-court-affirms-bob-mcdonnells-convictions/2015/07/10/144da937-66de-4644-816c-0bcea4803401_story.html

Press release: Fresh Amisom Ugandan battle group arrives in Somalia (18.06.2015)

AmisonUPDFP1

AmisonUPDFP2

Stand with Burundi (Youtube-Video)

The petitions:

Petitions for the ‘We are Burundi’