Kampala’s BRT at this stage is a pipe-dream!

The Bus Rapid Transport system together with a Metropolitan Area Transport Authority (MATA), in the midst of the Kampala Capital City Authority (KCCA), Kampala City Hall and Ministry of Kampala. This are having different heads combined with the mastermind on the top President Yoweri Kaguta Museveni. Doesn’t matter what the ones in the parishes are considering, the Division Mayors, Lord Mayor Lukwago, KCCA Director Musisi or even State Minister Kamya. The one rubber-stamping the initiatives is and will be the President. Since he has his finger into everything.

That is why I have no faith in BRT. Even if it is stop the congestion, the lack of public transport in Kampala and problems of control of the Boda-Boda’s, the authority of the Taxi’s and the Specials. There are still significant issues to be reached. It doesn’t matter if they are banning or stopping certain transport options. As long as the ones working, are the taxis and boda-boda’s. These are the ones who has designated routes and travels with licensing for their routes. The Taxis are usually used Toyota Hiace imported from Japan, second-hand ones who was former bread-trucks, who are rebuilt to fit as many people as possible.

While a BRT means there will be heavy investments in stages, in divisions and in congested areas to fit the paradigm of buses. It isn’t barely putting buses on the road and assume the population will start taking it. The need for steady implementation of road structure, of bus-companies, of driving schools and of time-tables has to be put on order to make sense for the citizens to use it. Since it needs to be better than the transportation options that are today, like the taxis, boda-boda’s and specials. At this stage the Uganda Investment Authority (UIA) in their feasibility study estimates the needed funds to get it going at this point to be the staggering $612.06 Million. With today’s value of the Uganda Shillings it is about Shs. 2,193,883,999,999 UGX, in other terms over 2.1 trillion shillings. Which means one tenth of the Financial Year budget of 21 Trillion Shillings in FY 2017/2018. Just to put in perspective.

This infrastructure project of this size and ramification better make the roads of Kampala into bricks out of gold. Clear every single pothole and make sure the gravel grade more than standard. This project has been going on for ages without any movement or significant progress. Why I am writing about it, well there suddenly if it is true, some Chinese Investors who wants to touch the erratic transport system of Kampala. This are together with the Chinese Ambassador to Uganda, at the State House discussing investments into it. Therefore, the sudden move of actual fueled money into it. As the 2.1 Trillion shillings doesn’t grow on trees.

President Museveni stated this today:

The Kampala Metropolitan Rapid Bus Transport project is a necessity. We should not continue to have so many cars with limited capacity” (…) “The investor will construct 26 rapid bus stations, 420 stage shelters and an initial 400 buses with a carting capacity of 74 passengers” (Museveni, 18.06.2017).

With this unknown Chinese Investor, they are clearly indicating some infrastructure and some buses to put up. If this will see the light of day and will be honestly implemented, than there are start, but it takes time to find routes and needed ways to make it profitable, as there will also be lost oppertunities for the ones who used taxis, specials and boda-boda’s on these roads. That is if this isn’t a scheme and plot of manufacturing more monies through the state-house. Which wouldn’t be surprising knowing how the President often operate.

The BRT would be a bonus and strengthen the congestive traffic of Kampala, a needed one for more time working and less time stuck in traffic jams. It would be important for the citizens leaving the divisions and traveling across town to work. But the state haven’t been able in the recent years to pull it off. Maybe Chinese investments would help it and their involvement in it would see it moving. But it shouldn’t just be the President’s blessings over the investments. The KCCA, Ministry of Kampala and City Hall should all have a say and make reports on how to build it properly. As the UIA even states there have only been a feasibility-study. That is preparation for the solution, but not the white paper or even framework for the Divisions or Central Business District of Kampala to make the BRT a success. Right now it is dream, which most likely could turn into a nightmare before its shuttle.

NAMA Proposals in 2013 are even more costly: “The capital costs budgeted over the 15 year period were estimated to total some US$ 1.181 Billion”. That is the double of the estimates from UIA in 2017. Therefore, something has either been scaled down or the NAMA was considering more aspects in their plans, than the UIA has. But is not like the President today has delivered any paperwork or reveled any sort of information what sort of possible deal he done with the “the Investor”. He could be scapegoat or even a mirage for all we know. Because none is on the up and up.

Especially considering he had a meeting with them at the State House in Entebbe with none of the leadership of Kampala. The ones in Kampala will just later get the news of the building and investments, therefore has to figure out how to implement it and work-out the perks. Parts of me wonder if the President even has looked into the documentation and considered the needed partners in play. But that is just how the President operates. He just can build Rome on his own or Kampala for that matter. He has all the skills and the brown envelopes at his disposal. Peace.