Uganda: Museveni directed who got Road Contracts

There is nothing President Yoweri Kaguta Museveni doesn’t touch or directs. He can sell land, build buildings or have the army to get rid of an opponent. It is all happening from whatever government housing his occupying or if his relaxing besides his cows at his ranch. The President can always just send a letter and change policy by doing so.

The President has in the past revised laws by directing his ministers. The President has stopped court cases and ensured the results are going into his favour. Therefore, today’s revelations aren’t shocking, but showing a steady pattern.

On the 15th May 2021 he wrote a letter to Uganda National Roads Authority (UNRA) director Allen Kagina that Zhongmei Engineering Group was getting the tender and agreement to build the road of Kanoni-Misingi-Mityana (37km).

On the 21st June 2021 he wrote a letter to Uganda National Roads Authority (UNRA) director Allen Kagina that Chongqing International Construction Corporation (CICO) was getting the tenders and agreements to build the roads of Kabowohe-Kitagata-Rukungiri (65,7km) and Misindye-Kabimbiri-Zirobwe-Wobulenzi-Kapeeka (138km).

On the 29th June 2021 he wrote a letter to Uganda National Roads Authority (UNRA) director Allen Kagina that Ashoka Buildcon Limited was getting the tenders and agreements to build the roads of Mpigi-Kibibi-Mityana (60km), Kanungu-Hamurwa (47km) and Butogota-Buhoma (32km).

This is giving direct tenders to two Chinese corporations and one Indian one. That is clear that the “Buy Ugandan, Build Uganda” BUBU slogan only gets that far. The National Resistance Movement (NRM) and the President have given away these tenders to please the loan agreements and interests of secret dealing with the President. If he didn’t have that… we would have seen Dott Services or other known companies getting involved.

The expensive roads and the corrupt practices comes from the head. The President breaks the laws himself. As UNRA isn’t having a tender process and neither is companies fighting to get the tender to build or fix these roads in question. No, the President has already secret agreements which is why his directing the UNRA to write agreements with them.

This shows how shady and how the state is micro-managed. When a President with 80 people in his cabinet and still he directs government organizations to follow his will. That is why his the personification of the state. The President of Life shows his ways by writing these letters.

This isn’t a sign of strength. Just like it is not a sign of strength to have the army to fix everything else. It is not sign of good state when the Head of State decides which companies that are building and constructing roads in the Republic. That job should be done by other with other titles and this is why they are created UNRA in the first place to follow procedures and do it correctly by law. Which isn’t following the direct directions of the President.

These three companies are getting a leeway and didn’t have to do their work. Somewhere and somehow they have gotten it behind closed doors. The President has made these deals and therefore the bureaucracy now has to clean the slate for him. They have to legitimize it… and that’s why the UNRA will in end make “agreements” with these companies. However, it was set in stone and the UNRA director knew that there was no choice.

The “High Above” said so and henceforth it is law. Peace.

UNRA: Termination of the Contract for Civil Works for Upgrading of Musita Lumino/Busia – Majanji Road (104km) From Gravel to Paved (Bituminous) Standard (12.06.2017)

Uganda: “Rejection of bids for upgrading of Rukungiri-Kihihi-Ishasha/Kanungu Road Proc Ref UNRA/Works/2016-2017/00035” (29.09.2017)