Two Problems with SGR: First the Cost of Phase 1 and President Kenyatta cowardly blocking of Gov. Joho!

President Uhuru Kenyatta is a coward for not letting the Governor of Mombasa County, the Orange Democratic Movement leader Hassan Ali Joho attend the launch today of the Freight Train at the Port Reitz Station in Mombasa. It seems the Jubilee Party cannot handle opposition and has to freeze them out. Even as the launch of the SGR was happening, the Police escorted him away.

Maybe because the Chinese wrote this about the Kenyan Railway:

Kiraithe added that the government, through the ministries of finance, transport and environment, hasbeen heavily involved in accelerating the completion of the SGR built by the China Road and Bridge Corporation.“But the infrastructure is for Kenyans and has been achieved to improve our living standards,” Kiraithe said. In 2013, President Xi Jinping and his Kenyan counterpart, Kenyatta, witnessed the signing of the memorandum of understanding on financing the Mombasa-Nairobi SGR. The Export Import Bank of China financed 80 percent of the project” (Morangi, 2017).

“I was among a group of people who wrote a letter to the president [Uhuru Kenyatta], specifically with regards to the value for money proposition,” political analyst Tom Mboya told RFI on Tuesday. At a staggering cost of nearly four billion euros–almost entirely funded by China’s Export Import bank– just for the first phase linking the capital Nairobi to the port city Mombasa, there is reason to be concerned, reckons economist Aly-Khan Satchu” (Okello, 2017).

The Presidency statement on it:

President Kenyatta, who was flanked by Deputy President William Ruto and First Lady Margaret Kenyatta, said every Kenyan should be proud of the Standard Gauge Railway. “I call upon all Kenyans whatever their political beliefs to celebrate, today we should be together holding hands in celebrations,” said the President moments after the cargo train pulled alongside the Presidential Dias waiting for the flag off. It was song and dance as choirs played patriotic songs apt for the moment. “This is the Kenya we seek and this is the Kenya we want our children to inherit from us and their children to inherit from them,” said President Kenyatta amid applause, cheers and ululation. President Kenyatta said the SGR will make the port of Mombasa more efficient and will enhance the performance of the facility where the Jubilee Government has invested more than Sh60 billion in the last four years” (Presidency, 2017).

By the Statement made by the Presidency yesterday means that the Government spent: 60bn times 4 Shs. 240bn on the Standard Gauge Railway. Still, the East African reported differently earlier in the month: “So far, Sh327 billion has been spent on the first phase of the railway between Mombasa and Nairobi and Sh150 billion on the Nairobi-Naivasha section. With a national population of about 46 million, every Kenyan is set to owe China Sh18,413 in SGR debt once the deal is sealed” (…) “The SGR has been President Kenyatta’s pet project since he came to power” (Mutambo & Omondi, 2017). So if this is true, than the Presidency are dropping different numbers than the papers. Clearly the government trying to look more efficient, than what they are in reality. This should worry since most of the building of the SGR are based on development loans from the Exim Bank.

Is this why the words of and address to this from Joho is so striking:

In the light of this, we hereby demand that

1. That the government release the terms of the contract with the Chinese Exim Bank, the details of disbursement and attendant relavant information

2. The Government of Kenya release all details of the Take or Pay contract between KPA and the financiers? What is the goods threshold and the responsibility of collection of the these fees.

3. Due to conflicting reports, the government clarify in details all charges related to goods and their destinations.

4. The government clarify the method of nomination of goods for rail and the point and implementation of charges.

5. The government clarify the extinction date of the Railway Development Levy on goods and come clean on the amounts collected since.

6. The government release the terms of the port concession, all monies paid and the details of the contract

7. The the Government clarify the details of site selection of Naivasha as a dry port. The feasibility study and the project appraisal report.

8. That the government release the “Willingness to Pay” survey of the goods for meant for railway and the feasibility report of the proposed Naivasha Special Economic Zone.

9. And that the Jubilee government show us their plan for Mombasa” (Hon. Ali Hassan Joho, 31.05.2017).

By all means the Governor of Mombasa wants to know the realities of the SGR, but that is something every single Kenyan deserves as this is the pet-project of Kenyatta. Kenyatta might be proud of Phase 1, but can the government carry the price of the trains and lines. Or is this is a stunt for development?

That the Governor was blocked from the Train Station that is opened in his county, as he was blocked from the relaunch of the ferries in March 2017. Shows that the Jubilee cannot handle opposition or their eyes on their projects. They are so initiated to represent the whole community, that if the community and citizens elects opposition. Than they are not allowed to enter public displays and their launching of projects. This has now been proven twice. That the Jubilee cannot handle NASA leadership or ODM party leaders. If they could than they would have entertained and made it possible for Governor Joho to be at the state functions as he is the local elected leadership of Mombasa county. Is that hard for the President and his deputy?

But the President and his Team is cowards who cannot even have the local government leadership at the launch of SGR at the Port Reitz Station. Peace.

Reference:

Morangi, Lucie – ‘ Chinese-built SGR to improve Kenya’s global standing’ (30.05.2017) link:http://www.chinadaily.com.cn/world/2017-05/30/content_29548836.htm

Mutambo, Aggrey & Omondi, George – ‘Uhuru seeks Sh370bn more to extend railway to Kisumu’ (16.05.2017) link: http://mobile.nation.co.ke/news/Kenya-requests-for-Sh370bn-for-SGR-third-phase/1950946-3928546-15jp48i/index.html

Okello, Christina – ‘Kenya’s ambitious new railway raises cost concerns’ (31.05.2017) link: http://en.rfi.fr/africa/20170530-kenya-4bn-railway-opens-amid-controversy-kenyatta-china

Presidency – ‘New dawn for Kenya as Standard Gauge Railway rolls out services’ (30.05.2017) link: http://www.president.go.ke/2017/05/30/new-dawn-for-kenya-as-standard-gauge-railway-rolls-out-services/

We thought we seen the worst; but the here comes the 20 Point Programme from Mzee!

Saturday Monitor 02.07.2016

Sometimes I think President Museveni is a bit too smart for himself, that must be it, as he have since start of his reign added and amended more plans than useful laws. That is something the world should know by now. He entered his first term after rebellion with the 10-Point Program that was supposed to reinvent and remake the democratic, accountability and facilitate the development of Uganda. Something that has been stalled for wish to stay in power and also his own nepotism, corruption and cronyism in government and state functions in general; together with no-need to leave the militaristic maneuvers of government.

“The NRM under the leadership of President Y. K. Museveni came up with the ten point programe of action. In 1987, Basing on the ten point program, President Museveni launched a Minimum Economic Recovery Programme followed by a series of reforms aimed at restoring macro-economic stability to provide a favourable environment for economic growth and private sector development. The key reforms were, liberalization, privatization, currency reform, changes in tax and fiscal policy plus restraining expansion in government expenditure while maintaining focus on economic recovery and growth” (Uganda 25 Years of Nation Building and Progress, Jan 1986 – Jan 2011, Printed: May 2011).

Museveni Cool Poster

That is why that when I read that President Museveni had the genius idea of a 20-Point Program, I was latterly laughing and crying in sadness of this so-called leader. Who supposed to lead and make change; after thirty years in power with a 81 Cabinet and created astonishing amounts of districts and sub-counties, that every town and nearly all villages have either one or two central LCV and other councilors to be bribed by the central-government. And in his genius attempt to spoilt the trade, he comes with another plan to cover over the atrocities and pledges that we’re recycled under campaigning in 2015 and 2016.

This comes from the leader who of late has already these wonderful plans to hold onto and supposed to finish in his lifetime, as he wants to promise the Ugandans the middle-Income position and also economic progress in the levels of South Korea and Singapore. Though, the corrupt and donor-friendly behavior is still necessary since the Petroleum money, is still not certain as it is still needed more development and investment before the profits from the black-oil drilled in the Lake Albert basin and Albertine region.

The first plan that was supposed to take over the failed 10-Point Program from the Economic and Development of the Republic, where the magical and all-covering; the Second plan the famous ‘Vision2040’, where all pieces of government and private sector we’re interconnected as the NRM-Regime had plans to reconfigure and also establish what they had did between 1986 and 2013. The plan that we’re released in 2013 said this: “a transformed Ugandan society from a peasant to a modern and prosperous country within 30 years”; I do not feel the need to say how much further they have come in the last three years.

Hon. Francis Mwijukye said: "Today I visited Karungu government secondary in Karungu subcounty- Buhweju district where I found students studying under very disturbing circumstances" (Mwijukye, 25.06.2016)
Hon. Francis Mwijukye said: “Today I visited Karungu government secondary in Karungu subcounty- Buhweju district where I found students studying under very disturbing circumstances” (Mwijukye, 25.06.2016)

The third plan that comes to mind was the National Development Plan II (NDPII) who we’re drafted and surely released during the 2015, and we’re written March 3, 2015. This was a plan for the infrastructure projects and the defining projects that we’re interconnected with railroads and also the major road projects of the UNRA, which is certain a magnifying economic prospect as the investments in infrastructure as the unfolding economic problems, that recently was reported from UNRA. So the President has issues with this alone, before releasing the 20-Points Program of 2016.

So with the hearing of a new plan from the grand National Resistance Movement and the Presidency of 30 years, if he had finished or wished to finish the first plan, the 10-Point Program. But, that wouldn’t make the political battlefield and the regression of progress so obvious; if anybody believes he will ever finish a program or even sufficiently have due-diligence behind a new program, you should dream on or reconsider you thought pattern.

With the newly released 20-Program Plan of 2016, is a rehash of old-ideas into a new format with the mix of the Vision2040, 10-Point Program and the National Development Plan II. That is a combined of these visions, as the 10-Point program is totally out of whack, the 2040 is in the midst of it and been in the works for three years without any real progress on the matter. The NDPII is a framework for basic transport and infrastructure that are parts of all the three other plans. So, this is far from finish and with the UNRA troubles, the World Bank suspension and the others issues with financing the grand infrastructure projects of late, while the Standard Gauge Railway and the Northern Corridor Integration Projects (NCIP), which is a collective planning of infrastructure between the East African nations we’re it need cooperative effort from the countries.

issues clinton uganda

So with all of this in mind, when reading the progressive, the revolutionary, the rebels new plan like the monstrosity levels of belief that he can sell yet another amazing plan to the public and donors. The reassessment the donors should do is that this in the mass of affairs and tricks the NRM-Regime have come with for three decades and was supposed to be new-found governance; instead it has been more of the same, just in another name, another package and another head-honcho who been able to smile with Bill Clinton, Gadaffi and all the dignitaries that wanted spend money on his government and newly created institutions under his leadership. This has all happen, while the Western countries have accepted the atrocities and brutality against civilians for the peace and assurance of progression of democratic values that over time have been proven as fool’s gold.

The reality of this new Plan is to repackage the same of promises and the so-called progression of the government institutions and the civil service delivery as hospitals, schools and roads. Through the neo-liberal structural adjustment plan that we’re accepted to get more World Bank loans in the 1980s, while now because of less donor-funding adding more loans into the bloated government budgets together with bigger government spending on growing parliament, growing districts and sub-counties, while the added expenditure on the projects as the rising prices on roads with little due-diligence, higher interests on the fallen loans and the expenses on military equipment. This all with the steady level of inflation and proved little will to change the service delivery from the NRM-Regime, as the international community have let most of it go without any impunity or real care.

Old Stats Uganda

As even the European Union proudly did this recently after the fraudulent election they discredit in their own report, still they we’re so giddy to do this:

“Goverment of Uganda to hold political dialogue with European Union as mandated in Art 8 of Cotonou Agreement” (Emma Were Tinka, 28.06.2016). So the true ethics of the European Union and democratic values can be traded of with a decent agreement and when the NRM-Regime can even be validated by EU, this talk and consider, even sign the agreement, but they might not implement it; as the due-diligence have never been a thing for Museveni, so after all this year? Why should it all of a sudden matter?

This new plan is another one of his schemes and plot to get donor-aid and get funding for his nepotism, his cars and airplanes as the direct budget and the over-priced infrastructure projects have silenced his critics as that have been used on tear-gas, Russian fighter-jets and other needed procurement, not on fixing schools and buying school-books for the students. That is no-need and not proved added value. This 20-Program plan is just non-sense and the ones that buys into it, are long lost causes like Ofwono Opondo and Andrew Mwenda. Peace.

13th Summit of the Northern Corridor Integration Projects – Joint Communique (23.04.2016)

13 NCIP Joint Communique P1 201613 NCIP Joint Communique P2 201613 NCIP Joint Communique P3 201613 NCIP Joint Communique P4 201613 NCIP Joint Communique P5 2016

%d bloggers like this: