UNRA: Termination of the Contract for Civil Works for Upgrading of Musita Lumino/Busia – Majanji Road (104km) From Gravel to Paved (Bituminous) Standard (12.06.2017) Share this:TweetShare on TumblrLike this:Like Loading...
Uganda: “Rejection of bids for upgrading of Rukungiri-Kihihi-Ishasha/Kanungu Road Proc Ref UNRA/Works/2016-2017/00035” (29.09.2017) Share this:TweetShare on TumblrLike this:Like Loading...